The Swartz Creek Community Schools bond construction has been moving forward and we have some exciting updates to share!

SCCS Elementary Update:

The following elementary school projects are still in progress:

  • Dieck & Morrish Elementary site work needs to be completed. (Parking lot and asphalt replacement) Work scheduled to be completed by Summer of 2022.
  •  Syring Elementary-Landscaping work still needed to be completed.
  • Climate Control at Gaines 

SCMS Update:

The following projects have been completed at SCMS:

  • Air Conditioning and new LED lighting has been installed and is ready for the 2021-2022 school year.
  •  New parking lot and student drop off on the north side of the building. The bus drop off and parent drop off locations are now separated. New sidewalks and medians were installed and ready for the new school year. View the youtube video for more information about traffic flow. https://www.youtube.com/watch?v=W9toDna5Dl0

The following SCMS projects are still in progress:

  • New construction has started on both the STEAM Innovation Wing and Office space. The new office space will be located at the south side of the building and will extend out from the previous school entrance. The STEAM Innovation wing is located on the east side of the middle school near the baseball field. The STEAM innovation wing includes 2 STEAM rooms along with one maker space room. The building will be two stories tall and expand learning opportunities including robotics, chemistry, engineering etc.
  • Exterior buildings are scheduled to be completed by the end of summer. Interior work on buildings will start in Fall of 2021. Both structures will be an awesome addition to our middle school. We are excited about the added security the new office space will add to the school.

The following projects will begin during spring/summer of 2022:

  • Renovate Student Bathrooms 
  • Renovate Staff Bathrooms 
  • Replace Main Entry Doors 
  • New Emergency Egress Windows  
  • Replace Exit Doors 
  •  Add New Student Lockers
  •  Replace Folding Partition Walls W/Fixed Walls  
  • Renovate Existing Office For Student Commons 
  • Replace Corridor Ceilings 
  • Renovate Existing Locker Rooms 
  • Renovate And Update Band And Choir Rooms 
  •  Replace/Add Classroom Cabinetry
  •  Replace Roof
  •  Renovate Existing Security Site Lighting  
  •  Upgrade Emergency/Exit Lighting 
  •  Replace Fire Alarm System
  •  Replace Corridor Lighting Fixtures 
  •  Replace Master Clock System

Swartz Creek High School 

The following projects have been completed this summer at SCHS:

  •  Air conditioning along with LED lighting.

The following SCHS projects are still in progress:

  • New construction has started on both the STEAM Innovation Wing and Office space. The new office space will be located at the east side of the building and will extend out from the previous school entrance. The STEAM Innovation wing is located behind the PAC on the north side of the building.  The STEAM innovation wing includes 2 science rooms along with one maker space room. The new high school wing will expand learning opportunities that include science, technology, engineering, art, robotics, skilled trades, etc.
  • Exterior buildings are scheduled to be completed by the end of summer. Interior work on buildings will start in Fall of 2021.  

The following SCHS projects will begin during spring/summer of 2022:

  •     Renovate Student Bathrooms  
  •     Renovate Staff Bathrooms 
  •     Replace Main Entry Doors 
  •     New Emergency Egress Windows   
  •     Replace Exit Doors
  •     Add New Student Lockers  
  •     Replace Corridor Ceilings 
  •     Renovate Existing Locker Rooms  
  •     Replace/Add Classroom Cabinetry   
  •     Renovate Existing Gymnasium 
  •     Replace Bleachers And Remove Stage In Gym 
  •     Replace Roof   
  •     Renovate Existing Security Site Lighting
  •     Upgrade Emergency/Exit Lighting
  •     Replace Fire Alarm System
  •     Replace Corridor Lighting Fixtures

SCHS Site Work 

  •    Reconstruct Safe Parking And Traffic Systems 
  •    New Fencing/Gates Around Fields And Lots 
  •    New Concrete Walkways

 

SCCS Administration Building (Complete)

 The new administration building is now complete. New office space, updated interior and a large meeting space can accommodate board of education meetings and allow for increased public attendance. The new office space will consolidate the SCCS administration into one building and that will foster greater collaboration and communication.